Great Waters renovation has gotten off to a great start! Items of interest for the first few weeks are:
- 900+ irrigation heads dug up in the first week by the Great Waters staff!
- A new wet well was installed at the pump house by ProPump and Controls
- Tree crews have made it from 11 through 18, removing trees for agronomic, design, and safety reasons.
- The course has been sprayed with roundup to avoid any contamination of the new grasses by the previous variety of bermudagrass.
- Great Waters GCM is removing sand from the bunkers to topdress and amend the soil in problem areas.
- Sea wall work on 12 is finished!
Below are a few pictures that capture some of the progress made over the last few weeks.
 |
Bunker sand being piled up in order to re-use and amend the soil in problem areas in fairways. |
 |
Wet well sleeve being installed at the pump-house. |
 |
Sleeve for the intake from the lake inside the wet well. |
 |
Concrete being poured around the wet well sleeve to stabilize it. |