The weather forecast for Tuesday and Wednesday of this week called for severe storms and up to 4 inches of rain. Well we dodged the heavy rain and only got about 1/2" for the two days. However, we had some VERY strong winds come thru on Wednesday morning. We lost about 10 trees on the golf course with most of them going down in the area between 17 green and 18 tee. We also have a ton of debris down all of the golf course. The wind was coming in so hard that it was blowing waves over the sea wall on 18. These pictures were taken after the strongest winds had already come thru. The waves on the sea wall on 18 are going over the short portion in the pictures but during the strongest winds it was blowing water up onto the green.We are out there cleaning up right now but it will take us more than a day or two to get everything cleaned up.
Thursday, May 1, 2014
Wednesday, April 30, 2014
Cart Path Repair at Clubhouse
We have been needing to do some cart path repair at the clubhouse for quite some time now but with the location of the repair and our closed days we have not been able to work it out yet. Last week we had 2 closed days in a row and finally were able to get this work done. The concrete crew spent the first day tearing out and forming up the area and then poured for most of the following day. We kept carts off of it on Thursday and we were able to open it up on Friday.
Thursday, April 17, 2014
Spring Aerification
On April 15th and 16th we aerified all of our greens with 1/4" core tines. This is our normal spring aerification but this year we are a little earlier than normal. We followed the same process as we have in the past. Our order of operations is as follows:
Topdress greens heavy with damp medium
Aerify with toro 648, 2 clean up laps, then fill in the middle. 2"X2" spacing
Brush with pull behind power brush, multiple directions
Blow off what sand and debris is left behind
Roll 2 directions
Add amendments
The rain on Tuesday morning did mess us up a little but with us being closed 2 days this week we were able to spill over into Wednesday and get everything finished up.
Topdress greens heavy with damp medium
Aerify with toro 648, 2 clean up laps, then fill in the middle. 2"X2" spacing
Brush with pull behind power brush, multiple directions
Blow off what sand and debris is left behind
Roll 2 directions
Add amendments
The rain on Tuesday morning did mess us up a little but with us being closed 2 days this week we were able to spill over into Wednesday and get everything finished up.
Wednesday, April 16, 2014
Expanding and Re-sodding tee on hole #2
On Monday and Tuesday of this week we had a chance to strip, expand and re-sod the 3 tee on Hole #2. We have always had trouble with this tee and have to re-sod this tee almost every year. We decided to change the grass type to Tifgrand. Tifgrand is fairly shade tolerant and stands up to traffic well. We also increased the size of the tee from around 900 sq. ft. to around 1400 sq. ft. Hopefully these changes will help us in the long run. We have also started using rolls of sod instead of pallets in areas that are large enough. This should help us to get back playing on this tee sooner than if we had used the smaller squares of sod that come on pallets.
I wish that the sod would have been a little more green when it came it but with this cold winter the sod farms are not greening up like they should be either. It should not take long before it greens up and we are back playing on it.
Before, notice the new painted line
Before, notice the new painted line
Sod cut and being stripped up. The corners have to be blown out like this in order to keep the slope on the side of the tee the same as the existing slope once the tee is expanded.
Clean up of cut sod
Tee mix added to each end and leveled with existing tee
Tilling entire tee with amendments
Laying the first roll of sod
Second row
Half way across
Almost all the way across
Rolling the finished product to help smooth everything out
Full view
Monday, April 14, 2014
Masters Week 2014
It was another busy Masters week here at Great Waters. We had 2.5" of rain on Monday that pretty much washed that day out but after that the weather was fantastic. The azalea's and dogwood's bloomed at the right time this year and our play numbers were high. Below are some pictures from last week.
Sunday, March 30, 2014
The 2014 Linger Longer Invitational
These
last couple weeks have been filled with detailed preparation for the 2014
Linger Longer Invitational tournament. With 15 different universities in
attendance, we have made a point to leave the players with the best course conditions
as possible. With the cold winter that we have experienced we knew that our
fairways and rough would not be at the level that we would like for them to be
so most of our focus was on preparing the greens. We did mow tees, fairways, and perimeters to
clean up the divots and mow what little grass is growing on them but we did a
few extra things on greens. The players and coaches were very happy with green
speeds and firmness.
Due to
the level of talent that the golfers had, the already difficult course was set
up in a way that would push each person to their full potential. Utilizing
rarely used alternate tees, and placing pins in very difficult locations, the
tournament was sure to test the abilities of each player. Saturday’s set up was
not too hard with a few tees moved up and a few pins in some easier locations.
This was done to ensure that everyone finished both rounds. The shotgun start
went off at 8:30 and the players played 36 continuous holes that day. The
University of Oklahoma was in the lead after round 1 with -19 but slipped to 3rd
after a second round score of +5. At the end of play on Saturday Georgia and
Alabama were tied at -20. The final round on Sunday led to the University of
Georgia taking the title, finishing the round at 7 under par with an overall
score of -27. The closest team to them was the University of Alabama finishing
Sunday’s round at 3 over par and an overall score of -17. On Sunday the course
was set up very difficult. There were only 3 rounds under par that day and Georgia
had all three of those on their team.
Monday, March 17, 2014
New assignment board in the Breakroom
We have been looking at installing a new tv in our break room to use as the job assignment board for our crew for quite some time. About 2 months ago we went ahead and installed it. The current set up has a separate dedicated computer that runs the 55" TV in the break room. We use a program called google drive to run a spreadsheet on the screen. Google Drive acts as an online storage database. This allows us to make changes to the spread sheet from any computer and any smart phone. The spreadsheet updates instantly when a change is made from any device. It has taken a little time to get all of the kinks worked out but we think that at this point we have it down pretty good. Google drive also lets you upload any photos taken on a smartphone straight to the drive. This helps us show pictures, both good and bad to the crew. We have also been using the large tv to show safety and training videos. The set up was extremely easy. We bought a USB to HDMI external video card, plugged that into the computer, then ran a HDMI cord from the card to the tv and we were done. The computer that runs the tv is located in a storage closet and it also has a monitor that is mirrored to what is showing on the tv. It has a wireless keyboard and mouse so that it is easy to stand in the break room and scroll through pictures with the crew.
Subscribe to:
Posts (Atom)
















































