Monday, July 8, 2013
Soggy start to July
We have had a very wet start to the month of July. It has been a wet spring and summer already but the month of July has just been miserable to be working outdoors. In the last 5 days we have had just over 6 inches of rain. And these are not just small showers with a little rain these are torrential downpours that create washouts in our bunkers, on the cart paths, and in the mulch beds. We have been able to clean everything up just about everyday. The guys are growing weary of pushing up bunkers but we will do it everyday we have too. We are just very thankful for the bunker renovation that we were able to perform 4 years ago or we would still be pumping out the 1.6" of rain that we got last Wednesday, then the 1.9" on Thursday, then the 1.1" on Friday, then the 0.5" on Saturday, and the 1.0" on Sunday. For the most part we have dodged the strong winds that have been associated with these storms. Here are a few pictures that I took over the weekend.
Wednesday, May 29, 2013
New Drainage 14 Tee
Last week we were closed for 2 days in a row and we took advantage of these two days to complete a drainage project on 14 Tee that was long over due. We ran drainage from the number 1 tee box past the 2 tee box and then down to the lake. The project was completed just like all of the drainage projects in the winter. First, the sod was stripped, then the trench was excavated with a mini-excavator, next a thin layer of gravel went into the bottom of the trench, then the slotted pipe placed onto the top of the gravel, after that the pipe is covered in gravel and the trench is filled to about 4 inches below ground level with gravel, next a layer of sand goes down on top of the gravel, and finally the sod that was removed earlier gets put back onto the top of the trench. We had a few things working against us in this project. First, there is not much fall from the back of the number 2 tee to the front of it and it is a large tee. Therefore, we had to be very precise when digging our trench and constantly checking with the transit to make sure that we had enough fall for the water to run to the lake. Secondly, the irrigation line for 14 Tee runs directly in the lowest point of the ditch that we were running our drainage in. This forced us to move over a few feet and run parallel to the line, trying to stay as close to the bottom of the wet area without hitting the irrigation line.
Wednesday, May 8, 2013
Greens Aerification 5-8-13
We aerified all of our practice greens and the nursery yesterday and the rest of the course today. We did a little bit of a different process than we have before. In the past we have always aerified the greens, either pushed the plugs off or blown them off (if they were dry enough), top dressed heavy, brushed greens (multiple directions), rolled greens, and then put out the amendments. This time we moved the top dressing to the front of the line. So we: top dressed heavy, aerified, bushed 3 times, blew off what was left, rolled, and then put down the fertilizer. The difference was a new counter-rotating brush that we got last year. It allows us to work the sand in much better than a traditional brush and it also broke up the plugs and worked some of that sand back into the holes therefore leaving us much less to blow off. We used 1/4" coring tines on a 2"X2" spacing. I am posting 2 videos of the whole process. The sound is VERY loud due to the equipment that was running during the filming. Also video quality is not the greatest due to a small memory card, but it is good enough to give you a good understanding of the process. The portion where we are brushing the green gets a little long but I wanted to show how much better the green looks with each new direction that we brush.
The first video shows the top dressing sand going down. You can see that we overlap the throws on the top dresser in order to get down enough sand. Next you see us doing 2 clean up laps with the aerifiers. We did 2 clean up laps because we did not want to cause any extra stress on all of the new sod collars that we have been installing and we also did not want the added stress of double aerification on the normal greens clean up laps, therefore the inside clean up lap is where the double up happens from pass to pass.
This video shows the brushing process and how we brush them 3 different directions. You can see less and less sand with each new direction. You then see that we use a pro force blower to blow off the thatch and turf that was separated from the plugs along with the little bit of sand that is left. And finally you see how we roll the greens to help smooth out any imperfections made by the aerifier along with any tire tracks from the carts.
Tuesday, April 30, 2013
Fertilizer Mix Station
Over the past few years we have used a regular spray program of fertilizer and primo on our fairways throughout the growing season. The mix is usually equal parts of 15-0-0 with 6% iron and 16-0-6 liquid fertilizer. The amount of primo used depends on the time of the year. We sprayed this mix for the first time this year and up until this point mixing up has always been a little bit of a chore. That is because over 20 gallons of each fertilizer must go into each tank that is sprayed and it usually takes 3 full tanks to spray all of our fairways and perimeters. A five gallon bucket was used to measure then pour the fertilizer into the sprayers. However, over the winter we installed a flow meter to the tanks that hold the fertilizer and ran it through the wall into our mix pit. We can now turn on the transfer pump and move exactly just how much we need into our mix tank, mix all of the fertilizer, primo, and water in there and then pump it into the sprayer. Here are a few pictures of the system. Most of the work seen was done by Chris Frame a member of our crew. We still have a small pipe with a valve on it in case we only need a few gallons, like when spraying tees or greens.
Tuesday, April 23, 2013
Re-sodding greens collars
Over the last few weeks we have been re-sodding some of our bad collars. So far we have just been doing the worst areas on the course and replacing them. The areas that we are doing first are the spots that are just completely bare around the greens. The topdressing throughout the winter, wear from mowers, and traffic from golfers can all be attributed towards the turf loss in these areas. We did a few of these areas last summer and found that if we just strip enough of the old sod off and replace it with new it would end up too high, most likely from the mat of roots from the old turf. After we figured this out we began to set our sod cutter much deeper to take out about 2 inches of material. We then come back thru and add a layer of sand to the areas, pack the sand and lay the new sod on top of the sand. This process seems to be working much better. It is slow, tedious work to level and cut the sod to just the right height and curve of the green. Here are a few pictures of the work being done. The sod that we are laying is not the best looking stuff right now due to the cold spring we have had all over the state, but with a little TLC we will have it looking great in no time.
The new sod that is going down is Tifgrand. It can tolerate much lower mowing heights than the 419 that is in our fairways and perimeters.
The new sod that is going down is Tifgrand. It can tolerate much lower mowing heights than the 419 that is in our fairways and perimeters.
Tuesday, April 9, 2013
Master's Week
It is Master's week and we have been as busy as ever here at Great Waters. We have done almost 800 rounds since this past Saturday (around 200 per day), and the rest of the week looks the same. The Dogwood's and Azalea's are in bloom and it really looks like Master's week. The rough is still lagging behind a little due to the cool spring we have had so far, but the greens and fairways are looking great. Here are a few pictures that we have taken over the past few days.
Sunday, March 31, 2013
New Equipment
Our current lease is up and our new John Deere equipment has been coming in over the last few weeks. Every piece that comes in gets a thorough inspection by Eric or George. We also have to make sure that heights of cut match up when we try a new piece of equipment for the first time. They also use this time to add any modifications that we may need to fit our job (like modifying the basket on the Sandpro to hold a backpack blower). We are looking forward to some warmer weather so that we can really put this stuff to use. Here are just a few pictures of some of the new stuff. Some of these were taken while they were still looking over a few things.
Tuesday, March 26, 2013
Parking lot work
With the golf course being so wet and the wind howling we spent yesterday doing some work to our parking lot. Our crew size has grown greatly from what it was 3 years ago so parking has become an issue around our shop. This area was already used as a parking area and some gravel was there from years ago. We capped it with a little more gravel and expanded the area to accommodate a few more cars.
Sunday, March 24, 2013
Storm during the tournament
Yesterday was supposed to be rounds 1 and 2 of the Linger Longer Invitational tournament. They started on time with an 8:30 shotgun planning to play 36 holes continuously all day. However, we had a 2 hour rain delay from 10:00 to 12:00. This put everyone behind and the wet conditions slowed pace of play down. We tried hard to get all 36 in yesterday but failed to do so with every group having 5-8 holes left in the second round. At that point the plan was to shotgun again at 8:30 to finish round 2 and go straight into round 3. However, Mother Nature had other plans. We received 2.5" of rain in the storm last night. The golf course was a mess and standing water was everywhere. We spent the morning cleaning up debris, pumping out bunkers and drains, pushing up bunkers and trying to get the course back into playing shape. The event was cut to 36 holes at this point and the golfers came out at 11:00 to finish up the final few holes of the 2nd round. I took a few picture of the course this morning. It might be the most standing water I have ever seen on the course and I feel like we did a pretty good job of getting it cleaned up.
The pictures really don't do it justice as most of the water had ran off or we had already pumped it down before I got to take a picture.
The pictures really don't do it justice as most of the water had ran off or we had already pumped it down before I got to take a picture.
Wednesday, March 20, 2013
Tournament Prep
We have been preparing for the Linger Longer Invitational tournament all winter and have really kicked it into high gear this week with our preparations. The warmer weather over the weekend along with the fertilizer that we put out and a little bit of rainfall has really made the course begin to wake up. The fairways, tees, and perimeters are really looking good and the contrast with the rough right now really looks sharp.
Wednesday is our closed day so we have taken most of today to polish off much of our detail work. Here are a few pictures of the guy's flymowing, edging bunkers, edging heads, drains, and yardage blocks. We also used today to get our liquid fertilizer sprayed onto greens.
Wednesday is our closed day so we have taken most of today to polish off much of our detail work. Here are a few pictures of the guy's flymowing, edging bunkers, edging heads, drains, and yardage blocks. We also used today to get our liquid fertilizer sprayed onto greens.
Subscribe to:
Posts (Atom)






.jpg)
.jpg)
.jpg)
.jpg)


























